Project
Management
At IQ Software, strong and readily available project management is essential.
This is why we:
a - Always assign a project manager local to the client, to ensure there is
good communication and to remove the possibility of misunderstanding. There
will always be someone who is able to visit the client site and meet up
regularly with the customer.
b - Always assign a project manager or senior engineer to handle any off-shore
element of a project. This would generally be local to the offshore development
centre.
c - Have our own IQtrack software available from the internet so that clients
can get a real-time update and status report on progress of any of their
projects.
Change Management
At IQ Software, good change management is an integral part of the process.
Through our IQbug software we are able to track all changes and bugs to the
system. As the customer works very closely with the project manager we are able
to manage change well together.
Development Methodology
At IQ Software we utilize RUP and UML for our projects. These are industry
recognized methodologies that are in widespread use.
1. Scoping and Requirement Analysis - Onsite
During this stage the following tasks are completed:
-
Identify Project
goals, Milestones and Critical Success factors
-
Define high level
Requirements, Boundaries and Exclusions
Propose Solution Architecture
-
Agree on Effort
Estimates and Timelines
-
Proposal Document and
Project plan are completed during this phase.
-
Identify initial
Use-cases.
2. System Study -
Onsite
Tasks Completed during System Study:
-
Detailed Requirements
gathering / study
-
Pilots / Proof of
Concept
-
Prototype Preparation
-
Detailed Requirements
Definition Report and Prototype are Signed-off after this stage.
-
Perform detailed use
cases analysis.
-
Initial UML diagrams
3. Analysis and Design
- Offshore
In this stage, using Requirement Definition Report and Prototype as the basis,
High-level design is finalized. Tasks involved are:
During this stage,
Integration issues, usability issues are considered before finalization of the
high level design.
4. Construction - Offshore
Coding is done as per pre-approved quality guidelines. The tasks involved are:
-
Low-level Design
-
UML design
deliverables (such as activity, class, state, CRC diagrams)
-
Unit Test Plans
Coding
-
Code Walkthroughs by
team leaders
-
Unit Testing by
developers
-
Documentation -
Technical and User Manuals
5. Testing and Audit -
Offshore
During this stage, Application goes through the following:
-
Installation Testing
-
Modular Testing
-
Integration Testing
-
Stress Testing
-
Fixing and
Verification
-
Audit Review
-
Packaging / Shipping
6. Deployment - Onsite
This stage is done Onsite and may call for involvement from customer. We are
keen to establish remote connectively in preparation for support requirements.
Tasks performed are:
-
Onsite Installation
-
Prepare end-user
Procedures and Training
-
Deliver training and
user documentation.
-
Acceptance testing by
customer - Evaluate system readiness
-
Data conversion for
production server
-
Test the helpdesk
infrastructure
-
Ongoing support
-
Install Remote Access
(if necessary and agreed)
7. Support – Onsite -
Offshore
Maintenance is considered another full project lifecycle, with generally a
shorter timeframe.
|